Galantas Gold Corporation has announced the results of the third and fourth exploration drill holes and prospecting samples at the Gairloch Project in Scotland. Hole 23-GL-04 intersected 4.42 grams per tonne (g/t) gold (Au), 0.71% copper (Cu), 0.52% zinc (Zn), 69 g/t cobalt (Co), and 3.74 g/t silver (Ag) over 31 meters, including 15.46 g/t Au, 0.80% Cu, 1.91% Zn, 133 g/t Co, and 6.35 g/t Ag over 6.95 meters. Hole 23-GL-03 intersected 1.34 g/t Au, 0.86% Cu, 0.16% Zn, 82 g/t Co, and 3.20 g/t Ag over 18 meters. The company has completed five holes totaling 580 meters and is now focused on generating additional drill targets along the deposit's strike. Prospecting identified 0.91 g/t Au in bedrock 1.4 kilometers from recent drilling, as well as 34.3% iron (Fe) and 0.19 g/t Au in bedrock within a 10-meter-wide banded iron formation. Galantas CEO Mario Stifano commented that the results indicate a potential large-scale mineralizing system and the company is keen to establish new target areas for further drilling.