Caledonia Mining Corporation Plc
Mineral Resources and Reserves Update at the Blanket Mine
(NYSE AMERICAN: CMCL; AIM: CMCL; VFEX: CMCL)
St Helier, February 6, 2023: Caledonia Mining Corporation Plc ("Caledonia" or the "Company") is pleased to announce an update to the NI 43-101 compliant Mineral Resources and Reserves estimates at its 64 per cent owned subsidiary, the Blanket Minein Zimbabwe ("Blanket")[1]. The total Measured and Indicated Mineral Resources estimate ("M&I") at Blanket, inclusive of Mineral Reserves, has increased by fifty-two percent to 1,095,000 ounces of gold and the total Mineral Reserves estimate at Blanket has increased by one percent to 395,000 ounces of gold, in each case as compared to the adjusted figures explained further below[2].
Minxcon (Pty) Ltd were commissioned by the Company to produce updated Mineral Resources and Mineral Reserves estimates based upon existing data, reflecting the completion of Central Shaft, and the migration to fully digital estimation protocols. The report was commissioned based upon data struck at March 31, 2022 for Mineral Resources and September 1, 2022 for Mineral Reserves.
Commenting on the Mineral Resources and Mineral Reserves update, Mark Learmonth, Chief Executive Officer said:
"I am delighted to be publishing this report reflecting the completion of Central Shaft which not only has increased M&I by 52% to over 1 million ounces, but also increased Mineral Reserves by 1% to 395,000 ounces, thus securing the long-term future of Blanket. The slight reduction in Inferred Mineral Resources is partly due to our long track record of growing Mineral Resources and successfully converting Inferred Mineral Resources into M&I, but also reflects the constrained deep level exploration due to sinking and equipping Central Shaft. We are pleased to have established new drilling platforms with resumed drilling."
"In 2022, the Company achieved its long-term target of producing 80,000 ounces of gold at Blanket - this, coupled with a high gold price, puts the Company in a good position to start to progress our new portfolio of assets supported by cash generated from stable production at Blanket."
The tables below compare the new NI 43-101 Mineral Resources estimate at March 31, 2022 and Mineral Reserves estimate at September 1, 2022 to the 1300 S-K TRS Mineral Resources and Reserves which were stated with an effective date of December 31, 2021 (see footnote 2 above for an explanation of column B below).
Mineral Resources Comparison | |||||||||||||
A |
B |
C |
Variance %(B to C) |
||||||||||
EffectiveDate |
December31,2021 |
December31,2021 |
March 31, 2022 |
||||||||||
Source |
1300S-KTRS |
1300S-KTRSbut calculated at 100% |
NI-43-101 to be published on SEDAR |
||||||||||
Basis |
Inclusive ofMineralReserves |
Inclusive of Total Mineral Reserves |
Inclusive of Total Mineral Reserves |
||||||||||
MineralResources Classification |
Tonnes |
Grade |
Au Content |
Tonnes |
Grade |
Au Content |
Tonnes |
Grade |
Au Content |
Tonnes |
Grade |
Au Content |
|
kt |
g/t |
koz |
kt |
g/t |
koz |
kt |
g/t |
koz |
kt |
g/t |
koz |
||
Measured |
1,215 |
3.06 |
119 |
1,899 |
3.06 |
187 |
5,065 |
3.32 |
541 |
167% |
8% |
190% |
|
Indicated |
3,347 |
3.18 |
342 |
5,229 |
3.18 |
535 |
5,659 |
3.04 |
554 |
8% |
-4% |
4% |
|
Total M&I |
4,562 |
3.15 |
462 |
7,129 |
3.15 |
721 |
10,724 |
3.18 |
1,095 |
50% |
1% |
52% |
|
Inferred |
5,419 |
3.17 |
552 |
8,467 |
3.17 |
863 |
8,995 |
2.92 |
844 |
6% |
-8% |
-2% |
Mineral Resources (March 31, 2022)
Notes:
1. Cut-off applied 1.5 g/t.
2. No geological loss applied for Measured, 5% for Indicated and Inferred.
3. Gold price: USD1,600/oz.
4. Mineral Resources for NI 43-101 are stated inclusive of Mineral Reserves.
5. Mineral Resources for NI 43-101 are reported as total Mineral Resources and are not attributed.
6. All orebodies are depleted for mining.
MineralReserves Comparison | ||||||||||||
A |
B |
C |
Variance %(B to C) |
|||||||||
EffectiveDate |
December 31, 2021 |
December 31, 2021 |
September1, 2022 |
|||||||||
Source |
SK-1300 TRS |
1300S-KTRSbut calculated at 100% |
NI-43-101 to be published on SEDAR |
|||||||||
Basis |
64% AttributableMineralReserves |
TotalMineralReserves |
TotalMineralReserves |
|||||||||
MineralReserves Classification |
Tonnes |
Grade |
Au Content |
Tonnes |
Grade |
Au Content |
Tonnes |
Grade |
Au Content |
Tonnes |
Grade |
Au Content |
kt |
g/t |
koz |
kt |
g/t |
koz |
kt |
g/t |
koz |
kt |
g/t |
koz |
|
Proven |
656 |
3.11 |
66 |
1,025 |
3.11 |
103 |
1,978 |
3.30 |
210 |
93% |
6% |
105% |
Probable |
1,751 |
3.30 |
186 |
2,736 |
3.30 |
290 |
1,964 |
2.94 |
185 |
-28% |
-11% |
-36% |
Total |
2,407 |
3.25 |
251 |
3,761 |
3.25 |
393 |
3,942 |
3.12 |
395 |
5% |
-4% |
1% |
.
Mineral Reserves (September 1, 2022)
Notes:
1. Mineral Reserve cut-off of 2.1 g/t applied.
2. The gold price that has been utilised in the economic analysis to convert diluted Measured and Indicated Mineral Resources in the life of mine plan ("LOMP") to Mineral Reserves is an average real term price of USD1,650/oz over the LOMP, as compared to USD1,622/oz for the 1300 S-K TRS.
3. Mineral Reserves are reported as total Mineral Reserves and are not attributed in the NI 43-101.
Enquiries:
Caledonia Mining Corporation Plc Mark Learmonth Camilla Horsfall |
Tel: +44 1534 679 800 Tel: +44 7817 841793 |
Cenkos Securities plc (Nomad and Joint Broker) Adrian Hadden Neil McDonald Pearl Kellie |
Tel: +44 207 397 1965 Tel: +44 131 220 9771 Tel: +44 131 220 9775 |
Liberum Capital Limited (Joint Broker) Scott Mathieson/Kane Collings |
Tel: +44 20 3100 2000 |
BlytheRay Financial PR Tim Blythe/Megan Ray |
Tel: +44 207 138 3204 |
3PPB Patrick Chidley Paul Durham |
Tel: +1 917 991 7701 Tel: +1 203 940 2538 |
Curate Public Relations (Zimbabwe) Debra Tatenda |
Tel: +263 77802131 |
IH Securities (Private) Limited (VFEX Sponsor - Zimbabwe) Dzika Dhana Lloyd Mlotshwa |
Tel: +263 (242) 745 119/33/39 |
The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.
Glossary
Unit |
Definition |
% |
Percent |
/ |
Per |
± or ~ |
Approximately |
° |
Degrees |
°C |
Degrees Celsius |
a |
Year |
cm |
Centimetre |
d |
Day |
g |
Grammes |
g/cm3 |
Grammes per cubic centimetre |
g/t |
Grammes per tonne |
Ga |
Billion years (1,000,000,000 years) |
ha |
Hectares |
hr |
Hour |
kg |
Kilogram (1,000 g) |
kL |
Kilolitres (1,000 l) |
km |
Kilometre (1,000 m) |
km2 |
Square kilometres |
koz |
Kilo ounces (1,000 oz) |
kt |
Kilotonnes (1,000 t) |
ktpm |
Kilo tonnes per month |
kV |
Kilovolt (1,000 volts) |
kVA |
Kilovolt ampere |
kW |
Kilowatt (1,000 W) |
l |
Litre |
m |
Metre |
m2 |
Square metres |
m3 |
Cubic metres |
mm |
Millimetre |
Moz |
Million ounces (1,000,000 oz) |
Mt |
Million tonnes (1,000,000 t) |
Mtpa |
Million tonnes per annum |
MVA |
Megavolt ampere |
oz |
Troy Ounces |
t |
Tonne |
t/m³ |
Tonnes per cubic meter |
tpd |
Tonnes per day |
V |
Volts |
x |
By / Multiplied by |
The following abbreviations were used in the Report:
Abbreviation |
Description |
2018 Report |
National Instrument 43-101 Technical Report on the Blanket Mine, Gwanda Area, Zimbabwe (Updated February 2018) |
AC |
Asbestos Cement |
amsl |
Above Mean Sea Level |
BETS |
Employee Trust for the benefit of the present and future employees of Blanket Mine |
BIF |
Banded Iron Formation |
Blanket Mine Company |
Blanket Mine (1983) (Pvt) Ltd |
Blanket or the Mine |
Blanket Gold Mine |
BQR |
Blanket Quartz Reef |
Caledonia or the Company |
Caledonia Mining Corporation Plc |
CAPM |
Capital Asset Pricing Model |
CBDZ |
Colleen Bawn Deformation Zone |
CIL |
Carbon-in-Leach |
CIM |
Canadian Institute of Mining, Metallurgy and Petroleum |
CMS |
Central Main Shaft |
CPI |
Consumer Price Indices |
CRM |
Certified Reference Material |
DCF |
Discounted Cash Flow |
DSR |
Disseminated Sulphide Reefs |
DSR |
Disseminated Sulphide Reefs |
EIA |
Environmental Impact Assessment |
EM Act |
Environmental Management Act (Chapter 20:27) No. 13/2002 |
EMA |
Environmental Management Agency |
Epoch |
Epoch Resources (Pty) Ltd |
FCFE |
Free Cash Flow to Equity |
FCFF |
Free Cash Flow to Firm |
Fidelity |
Fidelity Printers and Refiners Limited |
Fremiro |
Fremiro Investments (Private) Limited |
FW |
Footwall |
G&A |
General and Administrative |
GCSOT |
Gwanda Community Share Ownership Trust |
GGB |
Gwanda Greenstone Belt |
GMS |
Greenstone Management Services (Pty) Limited |
HG |
High Grade |
HW |
Hanging Wall |
IL |
Intensive Leach |
Kinross |
Kinross Gold Corporation |
KNA |
Kriging Neighbourhood Analysis |
LG |
Low Grade |
LIMS |
Laboratory Information Management System |
LoM |
Life of Mine |
Minxcon |
Minxcon (Pty) Ltd |
ML40 |
Mining Lease with registered number 40 |
MMA |
Mines and Minerals Act (Chapter 21:05) of 1961 |
MMCZ |
Minerals Marketing Corporation of Zimbabwe |
MSO |
GEOVIA Stope Shape Optimiser |
NI 43-101 |
National Instrument 43-101, Form 43-101 F1 and the Companion Policy Document 43-101CP |
NIEEF |
National Indigenisation and Economic Empowerment Fund |
NIR |
Not-In-Reserve |
NMD |
Nominal Maximum Demand |
NPV |
Net Present Value |
NSR |
Net Smelter Royalty |
NWGDZ |
Northwest Gwanda Deformation Zone |
OHL |
Overhead Powerlines |
PEM |
Prospectivity Enhancement Multiplier |
PPE |
Personal Protective Equipment |
PSA |
Pressure Swing Absorption |
QAQC |
Quality Assurance and Quality Control |
QP |
Qualified Person |
RoM |
Run of Mine |
RoR |
Rate of Rise |
SG |
Specific Gravity |
SGDZ |
South Gwanda Deformation Zone |
SoR |
Slope of Regression |
The Act |
Indigenisation and Economic Empowerment Act |
this Report |
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe" with an effective date of 1 January 2023 |
TMM |
Trackless Mobile Machinery |
TSF |
Tailings Storage Facility |
WACC |
Weighted Average Cost of Capital |
ZESA |
Zimbabwe Electricity Supply Authority |
ZINWA |
Zimbabwe National Water Authority |
ZMDC |
Zimbabwe Mining Development Corporation |
Cautionary Note Concerning Forward-Looking Information
Information and statements contained in this news release that are not historical facts are forward-looking information and forward-looking statements (collectively, "forward-looking information") within the meaning of applicable securities legislation that involve risks and uncertainties relating, but not limited, to Caledonia's current expectations, intentions, plans, and beliefs. Forward-looking information can often be identified by forward-looking words such as "anticipate", "envisage", "believe", "expect", "goal", "plan", "target", "intend", "estimate", "could", "should", "may" and "will" or the negative of these terms or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Examples of forward-looking information in this news release include: estimates of Mineral Resources and Mineral Reserves; the projections used in developing such estimates; the filing of a new NI 43-101 technical report; future production and cash generation at Blanket; and the progression of the Company's assets. This forward-looking information is based, in part, on assumptions and factors that may change or prove to be incorrect, thus causing actual results, performance or achievements to be materially different from those expressed or implied by forward-looking information, including interpretations of exploration results and assumptions relating to future costs and commodity prices.
Securityholders, potential securityholders and other prospective investors should be aware that these statements are subject to known and unknown risks, uncertainties and other factors that could cause actual results to differ materially from those suggested by the forward-looking information. Such factors include, but are not limited to: risks relating to estimates of Mineral Reserves and Mineral Resources proving to be inaccurate, fluctuations in gold price, increases in capital or operating costs, risks and hazards associated with the business of mineral exploration, development and mining, risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards, employee relations; relationships with and claims by local communities and indigenous populations; political risk; risks related to natural disasters, terrorism, civil unrest, public health concerns (including health epidemics or outbreaks of communicable diseases such as the coronavirus (COVID-19)); availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining or maintaining necessary licenses and permits, diminishing quantities or grades of Mineral Reserves as mining occurs; global financial condition, the actual results of current exploration activities, changes to conclusions of economic evaluations, and changes in project parameters to deal with unanticipated economic or other factors, risks of increased capital and operating costs, environmental, safety or regulatory risks, expropriation, the Company's title to properties including ownership thereof, increased competition in the mining industry for properties, equipment, qualified personnel and their costs, risks relating to the uncertainty of timing of events including targeted production rate increase and currency fluctuations, and the other risk factors discussed in the Company's reports filed with the SEC on www.sec.gov and with Canadian securiites regulators on www.sedar.com. Shareholders are cautioned not to place undue reliance on forward-looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. Caledonia undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.
National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") is a rule of the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Unless otherwise indicated, all Reserves and Resource estimates contained in this press release have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Classification System. These standards differ from the requirements of 1300 S-K adopted by theSEC, and Reserve and Resource information contained in this press release may not be comparable to similar information disclosed by U.S. companies. The requirements of NI 43-101 for identification of Reserves and Resources are also not the same as those of 1300 S-K, and any Reserves or Resources reported in compliance with NI 43-101 may not qualify as "Reserves" or "Resources" under 1300 S-K. Accordingly, the Mineral Reserve and Resource information set forth herein may not be comparable to information made public by companies that report in accordance with United States standards.
[1] This news release has been approved by Mr Dana Roets (B Eng (Min.), MBA, Pr.Eng., FSAIMM, AMMSA), Chief Operating Officer, the Company's qualified person as defined by Canada's National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). The Company's independent qualified persons as defined by NI 43-101, Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, FGSSA) in respect of the Mineral Resources estimate and Mr Daniel van Heerden (B Eng (Min.), MCom (Bus. Admin.), MMC) in respect of the Mineral Reserves estimate each of Minxcon (Pty) Ltd have verified the data disclosed herein, including sampling, analytical and test data informing the Mineral Resources and Mineral Reserves estimates, by reviewing the methodologies, results and all procedures undertaken in a manner consistent with industry practice, and all matters were consistent and accurate according to their professional judgement. There were no limitations on the verification process. A technical report prepared in accordance with NI 43-101 for Blanket will be filed by the Company on SEDAR (www.sedar.com) within 45 days of this news release.
[2] The percentage changes are based on the Technical Report Summary on Blanket Mine (the "1300 S-K TRS") prepared in compliance with the SEC's technical disclosure requirements for mining companies under new subpart 1300 of Regulation S-K ("1300 S-K") which was filed as exhibit 15.4 to the Annual Report on Form 20-F of the Company that had an effective date of December 31, 2021 and which was filed on EDGAR (www.sec.gov/edgar) on May 17, 2022, and which contains the Company's most recently published Mineral Resources and Reserves estimates. Mineral Resources and Reserves are stated in the 1300 S-K TRS pursuant to 1300 S-K on an attributable basis (i.e. 64%, based on the Company's percentage ownership of Blanket Mine) and Mineral Resources are stated exclusive of Mineral Reserves. Given that under NI 43-101 Mineral Resources and Reserves are stated on a 100% (i.e. non attributable basis) and Mineral Resources are inclusive of Mineral Reserves, the estimates in the 1300 S-K TRS (the "TRS Mineral Resources and Reserves") as shown in this announcement and to which the new estimates have been compared have also been grossed up to 100% (i.e. non attributable) and are shown on an inclusive basis in order to correlate with the methodology used to estimate the new NI 43-101 Mineral Resources and Reserves and thus provide a meaningful comparison to the previously published estimates in the 1300 S-K TRS - see table below with full details.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy. ENDUPDTAMRTMTAMBMJ
==